Automated Building Reporting
| Label | Report Text | Sort Order | Actions |
|---|---|---|---|
| Mains Drainage | I believe the property is connected to the public sewer | 0 | Edit |
| Mains Drainage - Shared | I believe the property is connected by a shared drainage system to the public sewer | 1 | Edit |
| Septic Tank | I believe the property is connected to a septic tank | 2 | Edit |
| Septic Tank - Shared | I believe the property is connected by a shared drainage system to a septic tank | 3 | Edit |
| Waste Pipes - Plastic | The above ground waste pipes are plastic | 4 | Edit |
| Waste Pipes - Cast Iron | The above ground waste pipes are cast iron | 5 | Edit |
| Waste Pipes - Asbestos Cement | The above ground waste pipes are asbestos cement | 6 | Edit |
| Waste Pipes - Lead | The above ground waste pipes are lead | 7 | Edit |