Automated Building Reporting
| Label | Report Text | Sort Order | Actions |
|---|---|---|---|
| Keep Boiler Area Clear | The area surrounding the boiler should be kept clear to help ventilation and prevent damage | 0 | Edit |
| Pipes Concrete Floors | Central heating pipes have been installed in the concrete floors. Copper pipes should be protected from cement otherwise they can prematurely fail. I am unable to confirm whether sufficient protection has been installed or to inspect the condition of the pipework | 1 | Edit |
| Warm Air Asbestos | Asbestos based materials are commonly utilised in warm air heating systems. If disturbed, the material could release harmful fibres into the property. Before commencing any work on suspected asbestos containing materials, a risk assessment should be carried out | 2 | Edit |
| Microbore Pipes | The central heating installation contains some micro bore pipes. They have a tendency to be more prone to blockages from scale build up as well as suffering from physical damage | 3 | Edit |