Automated Building Reporting

Admin

Report #177

Back to Past Reports
Report Details
Date: -
Client: -
Address: -
Reference: -
Technical Officer: -
Created: 07/12/2025 09:48:52
Report Entries
Drainage Description
Button: Mains Drainage
Text: I believe the property is connected to the public sewer
Button: Waste Pipes - Plastic
Text: The above ground waste pipes are plastic
Drainage Defects
Button: Inspection Chamber Cover Damaged - Rear
Text: The inspection chamber cover to the rear elevation is damaged and should be replaced
Button: Soil Stack Damaged - Repair
Text: The vertical above ground drainage pipe is damaged and repair is required
Button: Blocked Gulleys (Multiple)
Text: Some of the gulleys have become blocked with debris and they should be cleared to prevent localised flooding during periods of high rainfall