Automated Building Reporting

Admin

Report #151

Back to Past Reports
Report Details
Date: -
Client: -
Address: -
Reference: -
Technical Officer: -
Created: 12/11/2025 14:41:33
Report Entries
Rainwater Goods Construction
Button: Gutters Concrete
Text: The rainwater gutters are formed in concrete
Rainwater Goods Defects
Button: Blocked & Damp
Text: Some downpipes are in poor condition and are causing associated damage. Repairs are now required to prevent further deterioration
Button: Finlock Leaking
Text: Leakage was noted to the concrete rainwater goods. Urgent remedial works are necessary to prevent additional deterioration or water ingress
Estimated Repair Cost
Button: Estimated Cost
Text: I estimate the cost for the above Rainwater Goods works to be approximately:
Button: £500-£1500
Text: £500-£1500